Case studies

REAL SITES.
REAL RESULTS.

Construction teams using Daily Jobsight report saving 1-2 hours per day on documentation, with better coordination and fewer disputes.

Featured

Meridian Construction Group

New York, NY · Commercial — 24-story mixed-use

We cut daily report time from 90 minutes to under 15. The AI reads the photos and writes the narrative. My super reviews it, signs, and it's out the door by 5pm.

David K.

VP of Operations

75%
Reduction in report time
12
Active subcontractors coordinated
0
Missed daily reports in 6 months

Seattle, WA

Pacific Coast Builders

Healthcare — 4-story medical office

The look-ahead schedule is the thing that changed how we run the job. Every foreman knows their assignments two weeks out. We stopped chasing people.

Rosa M.

Superintendent

2WKS
Visibility ahead for every sub
40%
Fewer coordination calls per day
3DAYS
Ahead of original schedule

Chicago, IL

Heartland GC

Industrial — Distribution center, 280,000 SF

Change orders used to disappear into email threads. Now every CO has a status, a number, and an approval chain. The owner sees it the same time we do.

James W.

Project Manager

$2.1M
In COs tracked without disputes
100%
CO approval rate on first submission
4DAYS
Average CO approval time

From the field

I've been building for 22 years. This is the first software I've used that was actually built for someone on the jobsite, not someone in an office.

Frank P.

Senior Superintendent — Northeast GC

The drawing pins saved us on a dispute last fall. We could show exactly what was in place and when, with photo evidence linked directly to the sheet.

Angela R.

PM — Mid-Atlantic Builder

Our owner loves it. They log in and see where we are without calling us. That alone is worth the subscription.

Tony L.

Superintendent — West Coast Commercial

2HRS
Saved per day on reports
98%
Report on-time delivery rate
15MIN
Average report review time
4.9/5
Average superintendent rating

JOIN THE SITES
THAT RUN TIGHTER.